ITECH INTERFACE

Solutions

Stop writing the weight down. Store it, then report on it.

The first job most plants ask for: take the weight from the scale into a screen, keep it as CSV or in SQL, and build the reports from that store. We can do this inside an app you already use, or in a screen we build.

30 minutes with an engineer. You get a one-page plan. We confirm the panel and the devices before we quote.

1 · The operator screen
OrderSO-2231
ItemSand 20 mm
Live weight1,254.0 kg

The field is filled by the scale. A typed override is allowed only if you turn it on, and it asks for a reason.

2 · The same record, two stores

CSV

2026-10-06,SO-2231,Sand 20 mm,1254.0,kg,operator

SQL

weight_kg1254.0
order_noSO-2231

You choose the columns. Every later row uses that layout.

3 · Report and dashboard, from the store
6 Oct · Item 1418.4 kg
6 Oct · Item 227.1 kg
5 Oct · Item 1418.6 kg

Filter by day, item, order or operator. The report reads the CSV or the SQL table. Nobody copies it into a second sheet.

Ready to stop writing weights down?

Choose a time in your timezone. Google Calendar sends a Meet link for a 30-minute call with an engineer.

  • 30 minutes with an engineer
  • A one-page plan you keep
  • No obligation

Pick a free time. The Meet link arrives in the calendar email.

Choose a time